PROJECT CASE STUDY

Chesterfield Residential Pondbank Stabilization

Customer:

Nooning Tree Subdivision

Location:

Chesterfield, MO

Contractor:

DJM Ecological

Civil Engineer:

Cochran Engineering

Product:

BACKGROUND:

The subdivision of Nooning Tree in the west suburbs of St. Louis was developed in the early 2000s. In the spring of 2022 a dam for a three acre pond was renovated and required permanent erosion protection against the occasional wave action. While rock riprap was originally specified, the access to the dam was a golf cart path that would not support transport of the riprap needed. DJM Ecological, the project contractor, recommended InstaTurf® ShearForce™10 hybrid turf instant armor mat as an alternative that could easily be hauled to the dam, be easier to install/maintain, be a more resident-friendly alternative to rock and cost significantly less.

SOLUTION:

Following the approval by the Civil Engineer at Cochran Engineering, DJM Ecological commenced ShearForce10 installation by preparing the dam face soils into an acceptable seedbed and applying a low-maintenance seed mix of native grasses and forbs. ShearForce10 was then installed along the dam face using 12-inch fabric pins, with matting edges placed and anchored 1-2 feet below the normal water line to prevent undermining from wave action.

RESULTS:

There was an approximate 50% cost savings vs installing the originally specified rock riprap. The project was completed in just a few days with a small, 4-person crew, pickup truck and a Bobcat loader. Because of the smaller, lighter-weight vehicles that were used, the seed and ShearForce10 were effortlessly transported and placed on the site without disturbing the existing grassed-in areas.

ShearForce10 provided immediate protection of the newly applied seed and soil from the wave action, allowing effective establishment of native vegetation. Over 2 years later the ShearForce10 remains in place within the native vegetation to protect soil between the bunch-type grasses and increase its long-term erosion resistance. The native vegetation that is now reinforced by ShearForce10 requires minimal, ongoing maintenance and will provide a user-friendly shoreline for the residents for years to come.

For more information, contact Tim Lancaster

812.483.1532 | tim.lancaster@grassworxllc.com

Relevant Case Studies

Chesterfield Residential Pondbank Stabilization

Discover how the Chesterfield Residential Pondbank Stabilization project transformed a struggling dam into a resilient, eco-friendly solution. Faced with the challenge of transporting heavy rock riprap, DJM Ecological proposed the innovative InstaTurf® ShearForce™10 hybrid turf instant armor mat. This alternative not only saved costs by 50% but also ensured quick installation with minimal disruption to the surrounding environment. With native vegetation thriving and long-term erosion resistance achieved, this project exemplifies sustainable landscaping. Dive into the full case study to learn more about the impressive results and benefits for the Nooning Tree Subdivision residents!

Read More »

Get Your Free Sample Before You Leave

By Filling Out The Form