InstaTurf Project Spotlights

Project Name: Peabody Coal Constructed Streambanks Stabilization

Application: Overwinter Protection and Vegetation Establishment on Constructed Streambanks

Installation: ShearForce10 on Oct 25, 2018

Project Name: Peabody Coal High Flow Channel Protection Field Trial

Application: Evaluation of ShearForce10 for replacing rock riprap in high flow areas

Installation: ShearForce10 on Sept. 10, 2019